The purpose of this assignment is to create a project charter with a work breakdown structure.Select one case study in Chapter 8 of the textbook from the following options: Case Study: NurseManager or Case Study: Informatics Nurse Specialist (INS). The case study you select in this topicwill be used throughout the course to complete the assignments in Topics 3-7.Review Figure 3.2 "Project Charter Content" from Chapter 3 in the textbook. Use this as a model tocomplete the "Project Charter Template" located in the topic Resources folder. You will completethe template as if you are the project manager. The project charter will serve as a statement ofwork for the case study you selected in Chapter 8 of the textbook.This assignment requires one or two scholarly resources.Prepare Part 2 of the template according to the guidelines found in the APA Style Guide, located inthe Student Success Center. An abstract is not required.
The Health Insurance Portability and Accountability Act (HIPAA) is a major regulatory aspect of health care information technology (IT). Complete the
The Health Insurance Portability and Accountability Act (HIPAA) is a major regulatory aspect of health care information technology (IT). Complete the following for this assignment: Identify 1 type of healthcare information system, and explain the steps that would be required to conduct a HIPAA audit of the system within your




